Recently Completed Water Jobs:

  • Installed 9100 LF of 6" to 12" PVC and DIP including 11 gate valves, 11 hydrants, and 7 blowoff assemblies

  • Installed 13,773 LF of 8" PE and 11,787 LF of 2" PE water mains including 26 fire hydrants and 364 service renewals

  • Installed 13,143 LF of 8", 521 LF of 6", and 12,996 LF of 2" waterlines including 28 fire hydrants and 303 service replacements

  • Installed 13,100 LF of 8" and 12,600 LF of 2"  waterlines including 25 fire hydrants and 380 service replacements

  • Replaced 5400 LF of 12" , 17,400 LF of 10", and 24,800 LF of 8" water mains and associated appurtenances along with 289 services. This included 438 LF of 12-18" steel casing by bore and open cut